A2 Maastricht

One of the biggest tunnel which is located in Maastricht. This constructionconsists of 8 lines, with the total length of 2,530 km. The closed part( 65 sections) of the tunnel is a double deck construction, with the lengthfor each section is 24 m and span of 29 m in average.The scope of work is detailed drawing for dimension and reinforcementfor every section of the closed tunnel part.