Replacement of Interlocking and VDU System of Cilegon and Krenceng Station, Indonesia

By Elsicom Engineering With PT KAPM

4 years ago

This project is continued replacement of Interlocking and VDU system of Merak Project. Section between Rangkasbitung-Merak have single track and using VPI interlocking at all stations. The VPI Interlocking of Cilegon and Krenceng station was replaced by new Electrologixs interlocking and VDU system as control type for train operation.
Back
Elsicom Engineering
  • Jl. Prof. Dr. Surya Sumantri No. 91 Majesty Office Building A6-A7
  • Bandung 40164, West Java, Indonesia
  • © 2021 Elsicom Engineering. All rights reserved