Construction of Railway Signaling System, Simpang - Prabumulih Station Including Intermediate Block
Project Background
To enhance operational capacity, an intermediate block has been introduced between Prabumulih and Simpang Stations. This initiative is part of our broader strategy to optimize the railway network. As part of this enhancement, we are implementing a modern interlocking system and various wayside equipment to improve safety and efficiency. In collaboration with PT Kereta Api Properti Manajemen, we are committed to delivering the highest quality solutions, ensuring that the railway system operates smoothly and reliably. This upgrade will facilitate better train management, reduce delays, and ultimately support the growing demands of the coal industry in the region.
Project Completion
Completed and commissioned in 2023, the newly operational intermediate block is now running efficiently, showcasing the effectiveness of our comprehensive solutions. This upgrade includes the supply of all indoor equipment, such as advanced interlocking systems, power systems, and interface systems, along with outdoor equipment like LED signals and point machines.

© 2025 by Elsicom Engineering.