Modernization and Construction of Coal Line Stations between Muaraenim and Prabumulih Baru (X6)
Project Background
The stations between Muaraenim and Prabumulih Baru (X6) serve as crucial nodes on the coal line in South Sumatra. To enhance capacity and operational efficiency, these stations are being remodeled with a significant upgrade. The existing mechanical interlocking systems are being replaced with advanced electronic signaling.
Project Completion
Completed in 2022, the project scope includes supplying all indoor equipment, such as interlocking systems, power systems, and interface systems, as well as outdoor equipment, including LED signals and point machines. The work also covers installation, testing, and commissioning of the new systems. The Electrologixs Interlocking system, an ALSTOM product, will be introduced to modernize and improve the signaling infrastructure.